MODULAR DRIVE-THRU / DESIGN WORKSPACE

Equipment layout

50′ × 15′ shell · Your plan. Your equipment. To proportion.

Grafica StudiosWide Angle
Saved in this browserLocal draft · no live sharing
Proposed additions · original shell stays fixed

02 / FLOOR PLAN

Layout study

FP–01 / INCHES
100%
Start with an item from the equipment tray.

Select an item on the plan to rotate it or set its position.

Your name, notes, and layout save on this browser. Export a layout file to keep a backup or pass a copy to someone else. Changes do not synchronize.

FOOTPRINT CHECK

A blank canvas

Checks use 2D equipment envelopes, source wall geometry, the reserved bathroom, and the planned turning circle. Original door travel is not verified or checked. Proposed doors use conservative square swing envelopes. Stacked or wall-mounted equipment may show overlaps. Height, utilities, service clearances, ADA, operations, and code compliance require separate review.

How to use this plan · sources & limitations

Place: drag from the tray, or select an item then tap the plan. Keyboard: select a tray item, tab to the plan, and press Enter to place at the center. Use arrows to move 1″, Shift + arrows for 6″, R to rotate, Delete to remove, and Escape to cancel placement.

Scale: all geometry uses physical inches. The 600″ shell is the building width, not the page. Source-catalog equipment cannot be resized. Custom rectangles use your entered dimensions and remain unverified. Use + Wall to drag a partition, its round end handle to resize, + Enclose area for four walls, or + Door on a selected proposed wall. Original shell walls stay fixed. Listed quantities are scheduled references; you can place additional copies for studies.

Print: the layout report is explicitly not to scale. Its dimensions and scale bar show proportions; browser print settings can change physical output size. Use landscape paper. The blank planning PDF uses the same current plan and is also labeled NOT TO SCALE.

Sources: 27 October source geometry with the user-requested 2 November removal of the fixed upper-left partition and its dimensions, retaining the enlarged bathroom and single entrance; updated equipment collection, 26 October 2026, version 1, plus verified undercounter-freezer, speed-rail and tabletop-wedger footprints added 27 October. Symbols simplify the actual components and preserve outer footprints and right-hand sink orientation. The 60-inch circle stays clear of the preliminary fixture envelopes, but does not certify accessibility. Actual door hardware, clear openings, approach space, and local code require review. The original SketchUp source is preserved; this app-only partition revision is not synchronized to it; lavatory knee/toe clearance remains unverified. Door travel is not verified or checked.

Open current blank planning PDF · not to scale ↗

SHARE YOUR PLAN

Email your layout

Download your PDF, then attach it in your email app. You choose who receives it and press Send there.

These are self-reported details, not verified identity. A preparation date and time will be included automatically.

Up to five addresses, separated by commas.

Send to the Grafica team

Attach the downloaded PDF yourself. Opening an email draft does not attach or send it. If you use webmail, compose a message there and add the PDF from Downloads.

YOUR PLAN / CUSTOM ADDITION

Add custom equipment